One thermal installation, twice as much thermal stations
In 2017 we assembled a thermal installation connected to five thermal stations. This year, we added another five stations to allow double as much truck drivers to bring their containers to the exact right temperature. This way they can bring their goods to their final destination under the best thermal conditions.
Net capacity
1300 kW
Work rate steam boiler
1.7 tons/hour
Design pressure pipes
10 bars
Recovered capacity
83 kW
Steam and condensation x 10
All ten thermal stations are connected to the furnace room through underground steam pipes. Each of those stations are provided with two vapor hoses that are attached to the steam and condensation return pipes. The electrical heat tracing protects the pipes from extreme temperatures up to -15° Celcius.
The furnace room houses a steam boiler equipped with an economizer to heat up the feed water with flue gas heat in advance, leading to a positive impact on the energy consumption and the durability of the installation.